June 29 Closing

Finally got a good amount of rain over an inch!!  The course was really dry with no rain and 90 degree temperatures.

Greens:  Solid tine (3/4″) aerification with heavy topdress.  Greens will be rolled and by Friday should be pretty smooth.  The greens needed the compaction relief and some sand dilution for thatch.

Tees/Approaches

I verticut the Tees and Approaches which helps with firmness and thatch reduction.  Soil amendments were added as well for microbe health and root stimulation

Bermuda grass treatment on 1 fairway.  Necessary to eradicate common bermudagrass
Bermuda grass treatment on 1 fairway. Necessary to eradicate common bermudagrass
Fairways:  We verticut the Front 9 Fairways today and will continue tomorrow until all Fairways are verticut

Bunkers:  We edged bunkers thru 14 today.  We will go thru bunker edges working on depths and firmness this week

Dragging in sand after solid tine verification
Dragging in sand after solid tine verification
Advertisements

One thought on “June 29 Closing

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s